Case study one.  
Site: Blueprint, Bluepoint House, Coldhams Road, Cambridge
Main contractor/builder: N/A
Job: Remove all redundant supplies to rear unit as Scrap merchants moving out. Refit new supplies for power & lighting for all new printing equipment.
method: Larkinson scrap metal merchants moved to Sawston and Blueprint expanded into the rear unit. As thier power & lighting requirement was vastly different we removed all old equipment and accessories re-fitting new lighting and final power circuits to clients design.
CES comment: here the key was time, we worked over the Christmas break to complete within the deadline as new machinery was to be installed by others. We specified 150mm ladder rack to allow speedy cable installation now and for future alterations. we also fitted an improved lighting scheme which incorporated emergency lighting fittings.
 
 
Case study two.  
Site: Hills Road, Cambridge
Main contractor/builder: Sampson Construction
Job: Complete renovation and extension of house to premium level.
method:Work to plan whilst allowing the client amendments throughout the job. The house was to be wired throughout for AV/data, smart lighting, underfloor heating and multi-zone cental heating.
CES comment: The house was to be wired throughout for AV/data as specified by AudioFile,C cambridge. Mode by Lighting Sensations, Haslingfield. The client was very keen to have a premium quality installation integrating an almost commercial use of some equipment, such as MEM surge protection for specialist AV equipment.
 
 
Case study three.  
Site: CB1
Main contractor/builder: Croft Design & Build, Cambridge
Job: Kitchen re-fit, incorporating additional sockets, replacing all with MK Albany BSS range, minimalist appliance spurs, under cabinet lighting, ceiling track lights and Under Floor Heating.
method:Work within Crofts' design incorporating the clients ideas for the accessories/lighting.
CES comment:This was a straight forward job, the only tricky part was fitting the hob extractor as was totally suspended from the ceiling! The track lighting was chosen over recessed lighting due to the joist centres.
 
 
   
   